Drilling, Tunneling, and Utilities
HDD and Trenchless Tunneling
Our non-toxic, solidification reagents convert tunneling and drilling spoils to a manageable solid, on-site, in minutes. The solidified waste can then pass Slump and Paint Filter Tests, and typically requires a dose of less than 1.0% wt/wt.
The solidified slurry is transferred to dump trucks to be transported directly to the final disposal site. It reduces risks, lowers operational costs, and promotes a safer, more sustainable waste management approach in tunneling projects.